Testing & Commissioning

Verify Performance. Enable Handover. Support Operations.

Functional testing, point-to-point validation, sequence verification and integrated-system commissioning for BMS, SCADA and IoT projects.

30+
30+Commissioning & CX Engineers
✓
Point-to-PointSensor, actuator and controller validation
SOO
SequencesControl-sequence verification
IST
Integrated TestingMulti-system interface verification
Commissioning Process

Structured Verification from Preparation to Handover

01 · PRE-TESTReview points, graphics, schedules, sequences, interfaces and test records.
02 · FUNCTIONAL TESTINGValidate sensors, actuators, DDC panels and equipment controls.
03 · INTEGRATED TESTINGVerify HVAC and third-party system interfaces and operational sequences.
04 · REPORT & HANDOVERDocument defects, rectification, results, test records and handover evidence.
Performance Tuning

Beyond Pass / Fail.

Commissioning also provides an opportunity to tune sequences, identify integration defects and improve operational stability before handover.

Functional TestingPoint-to-point and equipment control validation.
Sequence VerificationConfirm control logic against the approved SOO.
Interface TestingValidate multi-system and third-party data exchange.
Handover EvidenceChecklists, reports, defect records and test documentation.
Commissioning Support

Build Confidence Before Handover.

Engage Eleware for BMS and integrated-system testing support.

Request Commissioning Support →